October 1, 2012
Caterpillar bulldozer D11R No.2 provided sterling service to the company while based at Stockton Mine.
Bought ex. Japan in March 2005 with 233hrs on the clock the D11R went straight to work at Stockton to replace the soon to be retired D11N No.1...Read more
June 17, 2011
A DHML Tamrock Pantera 1100 drill rig (pictured) was on hire to Burnside Contractors Ltd to drill blast holes as part of port works in Lyttleton Harbour.
The Pantera is an 18 tonne hydraulic top hammer rig capable of drilling 89mm to 127mm...Read more
August 2, 2010
Earthworks at Stockton Mine
In 2007 while principal contractor at Stockton Mine, Doug Hood Mining tendered for and won the contract to construct the Mangatini Sump, a key component of the mine storm-water management program.
The sump required the...Read more
July 1, 2006
Between 2001 and 2006 Doug Hood Mining was principal mining contractor at Solid Energy’s Strongman 2 opencast coal mine, 25km north of Greymouth on the West Coast of the South Island.
This contract involved drill, blast and high ratio...Read more
December 31, 2002
Between 1997 and 2002 DHML was contracted by Meridian Energy to excavate a tailrace for the 2nd Manapouri Power Station tunnel plus associated site works, for $3.5M.
The 2 stage contract required construction of a new tail race and widening of the...Read more
December 31, 2002
DHML was contracted between 2000 and 2002 to construct the Ashburton Aquatic Park (now Lake Hood) for the Ashburton Aquatic Park Charitable Trust.
Lake Hood is situated 6km from the town of Ashburton, mid Canterbury, in the South Island of New...Read more
December 31, 2002
DHML undertook a $12M whole-of-mine contract with Francis Mining for Echo Opencast Coalmine, Reefton, South Island from 1996 to 2003.
This contract incorporated all aspects of opencast coal mining including mine design & planning, overburden...Read more
December 31, 2001
In 1997 DHML began a 5 year association with Coeur Gold at the Golden Cross Mine, Waihi, south eastern Coromandel, New Zealand
This contract involved extensive bulk earthworks totalling 2.8M m3 comprising overburden stripping, ore extraction...Read more
July 1, 2001
6.5km state highway realignment
A state highway realignment contracted for $4.3M comprising 600,000m3 of earthworks including several large engineered fills of up to 36m in height and all drainage and pavement construction associated with the 6.5km...Read more
January 1, 2001
This project was a realignment valued at $1.8M and involving 2 km of pavement construction, 100,000m3 earthworks, multiplate culvert structures including a 3.2m diameter multiplate culvert and 2.7m diameter Helcor stock underpass.
Construction...Read more