Stockton Mine SN14 overburden stripping contract

May 10, 2019

In early 2018 Doug Hood Mining Ltd was awarded the contract to strip 1.0 million bcm of overburden from the SN14 block at Stockton Mine. The volume was increased in late 2018 to 1.5 million bcm extending work to mid-2019.

This work utilises 40, 120 and 200 tonne diggers, D8 and D11 dozers, 40 and 100 tonne dumptrucks and 16H grader with support from our Westport and onsite workshop crews and OEMs for relevant plant as required.