Check out this time-lapse video taken by McConnell Dowell Constructors of Doug Hood Mining Ltd excavating the rock-fall catchbench above Sumner Road, Christchurch.

This video starts about a week into the catchbench excavation and ends several weeks before completion but you can see the challenges of one-way-in, one-way-out, traversing a 45 degree scree slope, continuous drill and blast cycles, pilot track progressing, all below the crater rim rockface.

A description of our Sumner Road contract is available here.

Thanks to McConnell Dowell Project Engineer Hudson Klein for permission to use this video.


 