Mangatini Sump – Stockton Mine, 2009, South Island
August 2, 2010
Earthworks at Stockton Mine
In 2007 while principal contractor at Stockton Mine, Doug Hood Mining tendered for and won the contract to construct the Mangatini Sump, a key component of the mine storm-water management program.
The sump required the drilling, blasting, excavation and dumping of 1.6M m3 of solid rock, and was completed in 2009.